Case
Product Center
- High-temperature pressure-bearing Composite Insulating Tubes
- Composite Isolator and Metal Bonded Products
- Petroleum Logging Calibration Series Products
- Oilfield Logging Composite Material Profiles
- High-Temperature Pressure-Resistant Composite Insulation Rod for Logging Tools
- High-Temperature and Pressure-Bearing Rubber Products
- Specialized Accessory Products for Oilfield instruments
Consultation Hotline:13629207777(WeChat Same Account)
Quality supervision:15229006666
After-sale service:029-86670108
Email:info@richwelllogging.com
Address:No. 388 Caotan 9th Road, Xi'an Economic and Technological Development Zone
PetroChina Logging Co., Ltd. Changqing Branch
PetroChina Logging Co., Ltd. Changqing Branch Calibration Device / Semi-Space Device
This translation adheres to industry-standard terminology while keeping the structure of the original name. Let me know if you need further adjustments!
Calibration Device:
1.Board-type Non-Magnetic Wooden House: Waterproof, corrosion-resistant, and lightning-proof, with a double-pitched roof.
2.Main Frame of the Building: The main frame is detachable and can be disassembled. The bottom wooden panels are made of wood structure for on-site installation. The roof frame and slope can be split.
3.Insulated Walls: The walls are designed with insulation functions.
4.Exterior Appearance: The exterior of the building should be aesthetically pleasing and practical, with reserved holes for maintenance and inspection. The structure complies with the fourth-level fire resistance rating for buildings.
5.Pre-set External 220V AC Power Interface: The power wiring on the side wall of the door has leakage protection and electric shock protection measures. There is also a reserved space for the installation of a distribution box and three power socket positions.
Semi-Space Device:
1.Ambient Temperature: -20 to 45°C; designed for outdoor use, with a service life of more than 10 years.
2.The Complete Set of Equipment: The system mainly includes high-temperature pressure-resistant special composite material high-level pillars, low-level pillars, winches, etc.
3.High-Level Pillars: 3 pillars extending 8 meters above the ground; each supports a load greater than 500 kg; positioned horizontally in alignment with each other; each pillar is equipped with a hook. The nylon rope can be pulled by the winch to synchronize the lifting of 3 hook center points to a height of 6 meters.
4.Low-Level Pillars: 5 pillars, each supporting a load greater than 500 kg; positioned horizontally in alignment with each other.
5.Winch: The maximum lifting capacity is 5 kN, with a distance of more than 18 meters from the nearest high-level pillar, capable of lifting the instrument to a height of 6 meters above the ground.
- China National Petroleum Corporation Maintains Stable Operations in the First Half of 2020
- Downhole Fiber Optic Sensing AUT-F100 for Oil and Gas
- Drilling Fluid Drilling: A Critical Step in Oil and Gas Exploration
- Testing of Composite Insulators in Operation
- Criteria for Evaluating the Quality of Insulators